Equipped with three waste treatment departments.
We constantly study and improve the relevant design, adopt advanced technology and equipment, improve management, comprehensive utilization and other measures to reduce pollution at source, improve the efficiency of resource utilization, reduce or avoid the generation and emission of pollutants in the process of production, service and product use, in order to eliminate or reduce the harm to human health and the environment.
A special sewage treatment station is built and equipped with a professional sewage department to continuously improve and optimize the wastewater treatment process.
With a daily treatment capacity of more than 1000 tons of wastewater; The effluent discharge level can reach A, which is much higher than that of the wastewater treatment plant in the park.
In terms of solid waste treatment, Ningxia Sinostar has always been committed to controlling the production from the source and reducing the production volume of solid waste through process technology transformation.
A standardized solid waste storage room has been established according to the solid waste treatment standard, which is strictly collected, packaged and labeled in accordance with the requirements and stored temporarily.
slide